The topside modification work was done on following ONGC platforms in Tapti & Bassein Field.
AJR Oil & Gas Engineering Services Pvt. Ltd. worked as Project Management Consultant to DOEPL and was responsible for complete execution of project including but not limited to the following
Scope: The scope of this project included Project Management, Pre-construction survey, Erection, Installation, Post-construction Survey and Pre-commissioning. Marine Spread was the responsibility of the Contractor (L&T Hydrocarbon Engineering).
The work involved in this project included installation of Piping, structural Strengthening, Deck extensions at Cellar Deck and Main deck, Conductor Add-on piece above sea level, Electrical and Instrumentation.
The topside modification work was done on following ONGC Platforms in Cluster Field & Heera Field.
Project Completed in 2020-2021 Offshore Season.
Scope: The scope of this project included Project Management, Fabrication, Transportation, Pre-construction survey, Erection, Installation, Post-construction Survey, Pre-commissioning and Painting. Marine Spread was the responsibility of the Contractor (Afcons Infrastructure Ltd).
The work involved in this project included fabrication and installation of Piping, Modular rig modification, structural repair at Jacket Level, boat landing level, spider deck level, Deck extensions, Helideck/Structure strengthening and replacement with aluminium helideck, Architectural, Electrical and Instrumentation.
The topside modification work and painting was done on following ONGC Platforms in Mumbai High Field.
PCWPP-III is awarded by ONGC to M/s. Das Offshore Limited (DOL) on 02nd September 2021 & AJRES is appointed as PMC for the PCWPP-III Project by DOL. The project completion plan is by 15th May 2023.
Scope: The total scope of work involves maintenance painting at offshore platforms (46 nos) which mainly consists of surface preparation and protective coating of external surfaces of structure, piping, equipment, vessels etc. from (-1) MSL to top of topside.
In addition, repair works such as replacement of grating, handrails, structural steel and replacement other miscellaneous items are also required to be carried out on these platforms.
The broad scope consists of Survey, Design Engineering, Procurement, fabrication and Offshore Installation for maintenance painting works of approx. 7.5 lacs SQM and structural replacement works for gratings, handrails, etc. of around 605 MT along with replacement of Jumping ropes, Helideck landing net, Safety net and Boat Fenders for 46 Wellhead platforms.